How can sheet metal manufacturers make hidden bending losses visible across an existing press-brake fleet? In this project, 36 press brakes were monitored within a 136-machine production environment. The customer reported a 28.76% productivity improvement, while machine-state data helped make idle time, setup, tool changes, handling losses, microstops and downtime visible.

Free PDF · No registration

Press Brake Monitoring Case Study: 36 Machines Abkantpressen-Monitoring

Sheet metal manufacturing: making productive bending and hidden machine-time losses visible.

+28.76%

higher productivity

Customer-reported result

36

monitored press brakes

Within a 136-machine production environment

15 min

sensor installation

Per machine in the project

In this case study   Project   ·   Implementation   ·   Measures   ·   Results   ·   FAQ

THE PROJECT

At a Glance

Industry
Sheet metal manufacturing

Machine fleet
36 press brakes

Production environment
136 production machines

Machine generations
Build years 2012–2022

Operations
Calculation model: 2 × 8-hour shifts

Technology
External Novo AI retrofit sensors + WatchMen

Focus
Productive bending, idle time, setup, tool changes, handling, microstops and downtime

THE CHALLENGE

A Bending Job Can Occupy the Process Longer Than Planned

A press-brake order can remain on the machine considerably longer than its planned bending time. Setup, tool changes, part handling, inspection, waiting, microstops and downtime can all become part of the elapsed order window.
The challenge was therefore to separate productive bending from the hidden losses around it and understand why an order took longer than expected.

Productive Bending

Identify how much scheduled machine time actually becomes productive bending.

Setup & Tool Changes

Measure setup and tool-change activity consistently and identify avoidable preparation losses.

Handling & Interruptions

Make waiting between bends, part handling, microstops and longer downtime visible.

FROM MACHINE TO ANALYSIS

Retrofit. Validate. Understand.

Connecting the press brakes creates the machine-data foundation. Reliable production analysis comes from validated bending events and machine states combined with the order and production context needed to explain why productive bending stops.

01

Retrofit the press brakes

External Novo AI sensors were installed on the 36 monitored press brakes without PLC intervention. Installation took approximately 15 minutes per machine.

02

Validate bending events and machine states

Edge processing and validation support the recognition of productive bending, idle periods, setup activity, microstops and downtime.

03

Add production context

WatchMen connects machine states with order and production information so that losses can be interpreted together with geometry, material, tooling, batch size and quality requirements.

Retrofitting machines with a Novo AI AI sensor for real-time machine data

EXTERNAL SENSORS

Press Brake Data Without PLC Access

External retrofit sensors capture physical machine behavior without requiring access to the press-brake control system.
WatchMen turns the validated signals into a machine-state timeline, making productive bending, idle periods and recurring interruptions visible. Order, tooling and production context then help explain why a particular loss occurred.

More about machine data acquisition with Novo AI →

TURNING DATA INTO ACTION

Turn Bending Losses Into Practical Improvements

Monitoring shows where scheduled press-brake time is being lost. The next step is to focus on the largest recurring losses and verify whether operational changes release usable bending capacity.

01

Reduce hidden idle time

Review longer waiting periods around material readiness, preparation of the next order and machine availability. Use recurring patterns to improve readiness before the press brake should begin producing.

02

Improve setup, tool changes and part handling

Prepare tools, programs and material before the machine becomes available. Review recurring delays between productive bends and improve part staging, handling flow, workplace layout and standardized work.

03

Reduce recurring microstops and downtime

Investigate short repeated interruptions as well as longer faults. Combine the machine timeline with maintenance and production context, implement corrective actions and then compare the same indicators again.

RESULTS IN CONTEXT

What Improved During the Project

REPORTED PROJECT RESULT

−42.86%

less idle time

In the modeled production scenario, idle time was reduced by 42.86%. Detailed before-and-after values and the calculation basis are included in the complete case study PDF.

+20,707.2

additional productive machine-hours per year

Approximate annual capacity estimate across the 36 monitored press brakes.

Reported result: The customer reported a 28.76% productivity improvement. WatchMen helped make productive bending and recurring losses such as idle time, setup, tool changes, part handling, microstops and downtime visible for systematic investigation.

Annual capacity estimate: The modeled improvement corresponds to approximately 20,707.2 additional productive machine-hours per year across the 36 monitored press brakes. This represents released bending capacity within the existing machine schedule rather than a full year of directly measured additional output.

View the measurement basis in the PDF ↓

Context: These figures relate to the project described. Starting conditions, product mix, shift model and the measures implemented affect the result. A reduction in time losses does not automatically mean an equally large increase in OEE.

GOOD TO KNOW

Questions About Press Brake Monitoring

Which machines were included in the case study?

The monitored scope included 36 press brakes operating within a 136-machine sheet-metal production environment. The project environment includes machines built between 2012 and 2022.

What productivity result did the customer report?

The customer reported a 28.76% productivity improvement. Detailed idle-time, setup, handling and capacity figures are modeled values used to interpret the reported result.

How much idle time was reduced?

In the modeled production scenario, idle time was reduced by 42.86%. Detailed before-and-after values and the calculation basis are available in the full case study PDF.

How much additional productive capacity was calculated?

The model estimates approximately 20,707.2 additional productive machine-hours per year across the 36 monitored press brakes. This is an annualized capacity estimate rather than a full year of directly measured additional output.

How long did sensor installation take?

The supplied installation time is approximately 15 minutes per press brake. The external sensors were installed without PLC intervention.

What happened to waiting between productive bends?

The modeled interval between productive bends was reduced by 35.42%. This area can be influenced by part staging, handling flow, workplace layout and standardized work.

THE COMPLETE CASE STUDY

Details to Support Your Decision

Download the English PDF with the complete project description, modeled loss categories, results and detailed measurement and calculation basis.

Download the free PDF ↓

APPLYING IT TO YOUR PRODUCTION

What Would You Like to Make Visible?

Tell us how many press brakes you operate, their approximate years of manufacture and your biggest production question: productive bending, idle time, setup, tool changes, part handling, microstops or downtime?
Together, we can identify suitable pilot machines and determine which production losses should be made visible first.

Discuss your application →

Further reading: CNC Monitoring in Precision Tool Manufacturing · Understanding machine data acquisition: data and system boundaries · All Case Studies